Newsletter

The first name field is required.

The last name field is required.

The e-mail field is required.

The telephone field is required.

The occupancy date field is required.

The project field is required.

Completed since November 2014

Du Tour Residence

Laval / Laval

A few projects you might like…

Last townhouse available

-

Move in as early as 2020

TAK Village

Montreal / Rosemont - Angus

100 % sold

Le Barista

Montreal / Rosemont

85% sold in Phase 1

-

Move in as early as 2021

Arborescence

Bromont / Versant des Cantons