Newsletter

The first name field is required.

The last name field is required.

The e-mail field is required.

The telephone field is required.

The occupancy date field is required.

The project field is required.

Completed since 2014

Le Saint-Dizier

Montreal / Verdun

A few projects you might like…

54% sold

-

Move in as early as 2020

TAK Village

Montreal / Rosemont - Angus

60 % sold

-

Move in as early as maintenant

3-33 duCanal

Montreal / Lachine

92 % sold

-

Move in as early as 2019

Le Barista

Montreal / Rosemont