Newsletter

The first name field is required.

The last name field is required.

The e-mail field is required.

The telephone field is required.

The occupancy date field is required.

The project field is required.

Completed since March 2015

The W. Parkyn

Montreal / Verdun

A few projects you might like…

82 % sold

-

Move in as early as 2019

The Sainte-Hélène

Montreal / Villeray

60 % sold

-

Move in as early as maintenant

3-33 duCanal

Montreal / Lachine

100 % sold

The Hub

Montreal / Villeray